{"id":776,"date":"2026-02-12T16:43:17","date_gmt":"2026-02-12T16:43:17","guid":{"rendered":"https:\/\/montrosebusinesstimes.com\/?p=776"},"modified":"2026-02-12T16:45:05","modified_gmt":"2026-02-12T16:45:05","slug":"dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure","status":"publish","type":"post","link":"https:\/\/montrosebusinesstimes.com\/es\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/","title":{"rendered":"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure"},"content":{"rendered":"<p>After once calling it a \u201cmonumental win,\u201d Delta-Montrose Electric Association has withdrawn from a $72 million federal clean energy award that would have helped fund a 20-megawatt solar and battery storage project in western Colorado.<\/p><div id=\"montr-3938798039\" class=\"montr-paragraph-content montr-entity-placement\" style=\"margin-left: auto;margin-right: auto;text-align: center;\"><a href=\"https:\/\/www.mcsd.org\/PeakHomeschoolAcademy\" aria-label=\"\"><\/a><\/div>\n\n\n\n<p>The cooperative announced this week it is stepping away from the U.S. Department of Agriculture\u2019s Powering Affordable Clean Energy Program, or PACE, saying the project would have introduced too much financial risk for members.<\/p>\n\n\n\n<p>The proposed solar array \u2014 which had not yet been formally named and did not have a finalized site \u2014 was expected to include 80 megawatt-hours of battery storage, account for roughly 10% of DMEA\u2019s overall load and power about 7,000 homes. Total project cost was estimated at $96 million, with construction tentatively slated for 2027 and completion around 2030.<\/p>\n\n\n\n<p>In 2024, DMEA announced it had secured a partially forgivable $72 million PACE loan to support the project. Forty percent of the loan would have been forgiven if the project met federal requirements and came online.&nbsp;<\/p>\n\n\n\n<p>At the time, DMEA said it intended to stack federal tax credits and other incentives to potentially recover up to 90% of total construction costs.<\/p>\n\n\n\n<p>But after additional analysis, leadership determined the financial outlook had shifted.<\/p>\n\n\n\n<p>\u201cWe always evaluate the potential impact on members for any project. For the PACE program, there wasn\u2019t one specific factor that led us to withdraw from the funding,\u201d Johnston said. \u201cRather, it was the combination of several elements\u2014increasing construction costs, tax credit eligibility, onerous contract terms amongst other factors that ultimately increased the risk of this project.\u201d<\/p>\n\n\n\n<p>Johnston said inflationary pressures and rising construction costs have worsened since the award was first accepted.&nbsp;<\/p>\n\n\n\n<p>At the same time, uncertainty around tax credit eligibility and compliance requirements tied to the federal program added complexity and risk.<\/p>\n\n\n\n<p>Because the PACE funding was structured as a loan, DMEA would have needed to finance and build the project upfront, meet federal benchmarks, and then receive forgiveness over time.&nbsp;<\/p>\n\n\n\n<p>Under current conditions, Johnston said that structure created too much exposure.<\/p>\n\n\n\n<p>\u201cUnder current market conditions, moving forward with the project would have created upward pressure on member rates,\u201d he said. \u201cWhile specific rate impacts would have depended on final financing terms, construction costs, and power market conditions at the time of completion, our analysis indicated that proceeding under today\u2019s environment would have introduced meaningful cost risk to the membership.&nbsp; For DMEA, that risk for upward pressure just wasn\u2019t acceptable.\u201d<\/p>\n\n\n\n<p><strong>Comes after recent rate increase<\/strong><\/p>\n\n\n\n<p>The decision follows a December vote by DMEA\u2019s board to approve an average 7.49% rate increase across all member classes \u2014 the first broad increase in roughly six years.<\/p>\n\n\n\n<p>The rate adjustment, which took effect at the first of the year, includes a $7.50 increase to the residential single-phase access fee, elimination of the time-of-use rate class and adjustments to commercial and industrial rates. DMEA said the increase was necessary to offset inflation and maintain financial stability, and was not directly tied to the proposed solar project.<\/p>\n\n\n\n<p>Still, Johnston said protecting rate stability remains central to the cooperative\u2019s decision-making.<\/p>\n\n\n\n<p>\u201cWithdrawing from this award was not an easy choice, but ultimately not all governmental funding is a good fit, and it\u2019s our job to determine what is in the best interest of our members,\u201d he said in the withdrawal announcement. \u201cOur membership always comes first.\u201d<\/p>\n\n\n\n<p><strong>PACE program<\/strong><\/p>\n\n\n\n<p>The PACE program has awarded more than $1.45 billion nationwide as of January 2025 to support renewable energy and battery storage projects in rural communities.<\/p>\n\n\n\n<p>Other Colorado recipients include La Plata Electric Association, which received $13.4 million for a 5-megawatt solar and battery project, and Poudre Valley Rural Electric Association, awarded $9 million for two community solar and storage projects.<\/p>\n\n\n\n<p>In Delta County, DMEA\u2019s wholesale supplier, Guzman Energy, partnered on the 80-megawatt Garnet Mesa Solar project, which came online in 2025. DMEA also operates small hydro facilities and a modest solar installation at its Montrose headquarters.<\/p>\n\n\n\n<p>Johnston said the cooperative is not ruling out future renewable projects that fit its financial criteria.<\/p>\n\n\n\n<p>\u201cWe\u2019re disappointed, but not discouraged,\u201d he said. \u201cWe\u2019re proud of the fact that we do have hydro facilities as well as solar as part of our local renewable portfolio and certainly are open to other opportunities as they arise.\u201d<\/p>\n\n\n\n<p>For now, however, DMEA concluded the risks attached to the PACE-backed project outweighed its potential benefits for members.<\/p>\n\n\n\n<p>Justin Tubbs is the Montrose Business Times editor. He can be reached by email at justin@montrosebusinesstimes.com or by phone at 970-765-0915 or mobile at 254-246-2260.<\/p>","protected":false},"excerpt":{"rendered":"<p>After once calling it a \u201cmonumental win,\u201d Delta-Montrose Electric Association has withdrawn from a $72 million federal clean energy award that would have helped fund a 20-megawatt solar and battery storage project in western Colorado. The cooperative announced this week it is stepping away from the U.S. Department of Agriculture\u2019s Powering Affordable Clean Energy Program, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":778,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,21],"tags":[],"class_list":["post-776","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure - Montrose Business Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/montrosebusinesstimes.com\/es\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/\" \/>\n<meta property=\"og:locale\" content=\"es_MX\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure - Montrose Business Times\" \/>\n<meta property=\"og:description\" content=\"After once calling it a \u201cmonumental win,\u201d Delta-Montrose Electric Association has withdrawn from a $72 million federal clean energy award that would have helped fund a 20-megawatt solar and battery storage project in western Colorado. The cooperative announced this week it is stepping away from the U.S. Department of Agriculture\u2019s Powering Affordable Clean Energy Program, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/montrosebusinesstimes.com\/es\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/\" \/>\n<meta property=\"og:site_name\" content=\"Montrose Business Times\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-12T16:43:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-12T16:45:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/02\/dmea-1024x768.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Publisher\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Publisher\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/\"},\"author\":{\"name\":\"Publisher\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#\\\/schema\\\/person\\\/8f2cc2656a3550e108abc0dfd1fcc13a\"},\"headline\":\"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure\",\"datePublished\":\"2026-02-12T16:43:17+00:00\",\"dateModified\":\"2026-02-12T16:45:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/\"},\"wordCount\":762,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/dmea-scaled.png\",\"articleSection\":[\"Business\",\"News\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/\",\"url\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/\",\"name\":\"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure - Montrose Business Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/dmea-scaled.png\",\"datePublished\":\"2026-02-12T16:43:17+00:00\",\"dateModified\":\"2026-02-12T16:45:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/dmea-scaled.png\",\"contentUrl\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/dmea-scaled.png\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#website\",\"url\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/\",\"name\":\"Montrose Business Times\",\"description\":\"Montrose Business Times: News, Business, Government, Community, Developmenr and more\",\"publisher\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#organization\",\"name\":\"Montrose Business Times\",\"url\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/MBT-Logo_small.jpg\",\"contentUrl\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/MBT-Logo_small.jpg\",\"width\":267,\"height\":51,\"caption\":\"Montrose Business Times\"},\"image\":{\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/#\\\/schema\\\/person\\\/8f2cc2656a3550e108abc0dfd1fcc13a\",\"name\":\"Publisher\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2dd07ed29c306091101df5af92d7bb29de405d11b95232d432877852f0ca2369?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2dd07ed29c306091101df5af92d7bb29de405d11b95232d432877852f0ca2369?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2dd07ed29c306091101df5af92d7bb29de405d11b95232d432877852f0ca2369?s=96&d=mm&r=g\",\"caption\":\"Publisher\"},\"sameAs\":[\"https:\\\/\\\/montrosebusinesstimes.com\"],\"url\":\"https:\\\/\\\/montrosebusinesstimes.com\\\/es\\\/author\\\/793228pwpadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure - Montrose Business Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/montrosebusinesstimes.com\/es\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/","og_locale":"es_MX","og_type":"article","og_title":"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure - Montrose Business Times","og_description":"After once calling it a \u201cmonumental win,\u201d Delta-Montrose Electric Association has withdrawn from a $72 million federal clean energy award that would have helped fund a 20-megawatt solar and battery storage project in western Colorado. The cooperative announced this week it is stepping away from the U.S. Department of Agriculture\u2019s Powering Affordable Clean Energy Program, [&hellip;]","og_url":"https:\/\/montrosebusinesstimes.com\/es\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/","og_site_name":"Montrose Business Times","article_published_time":"2026-02-12T16:43:17+00:00","article_modified_time":"2026-02-12T16:45:05+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/02\/dmea-1024x768.png","type":"image\/png"}],"author":"Publisher","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Publisher","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#article","isPartOf":{"@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/"},"author":{"name":"Publisher","@id":"https:\/\/montrosebusinesstimes.com\/#\/schema\/person\/8f2cc2656a3550e108abc0dfd1fcc13a"},"headline":"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure","datePublished":"2026-02-12T16:43:17+00:00","dateModified":"2026-02-12T16:45:05+00:00","mainEntityOfPage":{"@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/"},"wordCount":762,"commentCount":0,"publisher":{"@id":"https:\/\/montrosebusinesstimes.com\/#organization"},"image":{"@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#primaryimage"},"thumbnailUrl":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/02\/dmea-scaled.png","articleSection":["Business","News"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/","url":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/","name":"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure - Montrose Business Times","isPartOf":{"@id":"https:\/\/montrosebusinesstimes.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#primaryimage"},"image":{"@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#primaryimage"},"thumbnailUrl":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/02\/dmea-scaled.png","datePublished":"2026-02-12T16:43:17+00:00","dateModified":"2026-02-12T16:45:05+00:00","breadcrumb":{"@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#primaryimage","url":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/02\/dmea-scaled.png","contentUrl":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/02\/dmea-scaled.png","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/montrosebusinesstimes.com\/dmea-withdraws-from-72m-federal-solar-award-citing-rising-risk-and-rate-pressure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/montrosebusinesstimes.com\/"},{"@type":"ListItem","position":2,"name":"DMEA withdraws from $72M federal solar award, citing rising risk and rate pressure"}]},{"@type":"WebSite","@id":"https:\/\/montrosebusinesstimes.com\/#website","url":"https:\/\/montrosebusinesstimes.com\/","name":"Montrose Business Times","description":"Montrose Business Times: Noticias, Negocios, Gobierno, Comunidad, Desarrollo y m\u00e1s","publisher":{"@id":"https:\/\/montrosebusinesstimes.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/montrosebusinesstimes.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/montrosebusinesstimes.com\/#organization","name":"Montrose Business Times","url":"https:\/\/montrosebusinesstimes.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/montrosebusinesstimes.com\/#\/schema\/logo\/image\/","url":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/01\/MBT-Logo_small.jpg","contentUrl":"https:\/\/montrosebusinesstimes.com\/wp-content\/uploads\/2026\/01\/MBT-Logo_small.jpg","width":267,"height":51,"caption":"Montrose Business Times"},"image":{"@id":"https:\/\/montrosebusinesstimes.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/montrosebusinesstimes.com\/#\/schema\/person\/8f2cc2656a3550e108abc0dfd1fcc13a","name":"Publisher","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/2dd07ed29c306091101df5af92d7bb29de405d11b95232d432877852f0ca2369?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2dd07ed29c306091101df5af92d7bb29de405d11b95232d432877852f0ca2369?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2dd07ed29c306091101df5af92d7bb29de405d11b95232d432877852f0ca2369?s=96&d=mm&r=g","caption":"Publisher"},"sameAs":["https:\/\/montrosebusinesstimes.com"],"url":"https:\/\/montrosebusinesstimes.com\/es\/author\/793228pwpadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/posts\/776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/comments?post=776"}],"version-history":[{"count":1,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/posts\/776\/revisions"}],"predecessor-version":[{"id":779,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/posts\/776\/revisions\/779"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/media\/778"}],"wp:attachment":[{"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/media?parent=776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/categories?post=776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montrosebusinesstimes.com\/es\/wp-json\/wp\/v2\/tags?post=776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}